The New Flexible Steinmetz Hall: the Perfect Addition to the Dr. Phillips Center for the Performing Arts
The (...)
(French and English version)
In 2019, after three years of construction, Le Diamant Theatre was officially made a (...)
(English version)
Every year, new convention centres are built as the exhibition industry generates great economic (...)
(English version)
The evolution of flexible space in theater buildings has called for breakthroughs in stage (...)
(English version)
A Gala Venue® Seating System for "exible multipurpose halls has been integrated into the new (...)
(English version)
Adding flexibility to performing arts centers can be a way to fulfill a venue’s mission and (...)
(English version)
Situated on the campus of the École Polytechnique Fédérale de Lausanne in Switzerland the Swiss (...)
(English version)
A resounding success achieving international recognition, financial sustainability and acoustical (...)
(English version)
The Tobin Center for the Performing Arts has had little trouble attracting audiences for its variety (...)
(English version)
The Tobin Center for the Performing Arts’ opening act — its financial first season — has been (...)
(English version)
In December 2013, Gala was very pleased to sign a major Contract with ILK Construction to supply a (...)
(English version)
Opened this May as the latest part of the École Polytechnique Fédérale de Lausanne’s campus, (...)
(English version)
When you step inside the Swiss Tech Convention Center in Lausanne, Switzerland, the spacious (...)
(English version)
Gala Moving Floor System highlights Edinburgh’s EICC expansion.
(English version)
With the press of a button, the H-E-B Performance Hall in the Tobin Center for the Performing Arts (...)
(English version)
The Tobin Center for the Performing Arts’ main concert hall will have the ability to rank with the (...)
(English version)
A high-tech conference and event space can be effortlessly transformed into multiple configurations (...)
(English version)
The flexibility to transform a performance space quickly and effectively, both in the audience as (...)
(English version)
On May 19th and 20th this year, the Regent Casino Showroom and Event Center opened its doors to two (...)
(English version)
Capacity and functionality have been exploited to create a state-of-the-art, multi-functional (...)
(English version)
Two multipurpose venues illustrate how the conversion requirements of these performance centres were (...)
(English version)
After years of neglect and decay, the curtain rises again at the Teatro Campos Eliseos in Bilbao.
(English version)
A moving floor allows melbourne convention centre’s plenary hall to transform itself into a myriad (...)
Больше новостей ...
Последние новости
Рубрики
архив
- Февраль 2024 (2)
- Июль 2023 (2)
- Май 2023 (4)
- Апрель 2023 (3)
- Октябрь 2022 (1)
- Сентябрь 2022 (2)
- Июль 2022 (2)
- Сентябрь 2021 (1)
- Апрель 2021 (2)
- Февраль 2021 (2)
- Январь 2021 (2)
- Октябрь 2020 (2)
- Май 2020 (1)
- Декабрь 2019 (2)
- Август 2019 (2)
- Июнь 2019 (2)
- Май 2019 (2)
- Март 2019 (2)
- Март 2018 (2)
- Январь 2018 (2)
- Октябрь 2017 (2)
- Сентябрь 2017 (4)
- Апрель 2017 (2)
- Март 2017 (2)
- Январь 2017 (6)
- Сентябрь 2016 (2)
- Декабрь 2015 (2)
- Октябрь 2015 (1)
- Сентябрь 2015 (2)
- Август 2015 (1)
- Январь 2015 (2)
- Декабрь 2014 (1)
- Сентябрь 2014 (4)
- Август 2014 (1)
- Январь 2014 (5)
- Январь 2013 (2)
- Январь 2012 (2)
- Январь 2010 (2)
- Январь 2009 (2)